BAUER RG21T

Foundation rig with telescopic leader mast

Our two multifunctional Bauer RG21T pile-driving rigs (soil mix / secant piles / sheet piles / soldier pile walls and gravel cores) can work up to 21 metres deep.

 

specsheet 1431.12 KB